Ten weeks with the Halcyon team, rebuilding the scheduling product around a single planning surface instead of four disconnected screens. Activation in the first quarter is up 38%.

  • One planning canvas replaced the calendar, list, board, and timeline views
  • Onboarding cut from eleven steps to four
  • Handover complete — Halcyon's two engineers now own the repository

December 2025

Log 017

Studio

We are booking from March

Two engagements at a time is still the rule, so the calendar has moved out. If you are planning something for spring, this is the month to talk.

  • Two Build slots open in March and April
  • Strategy sprints can usually start within three weeks
  • Partner seats are full until June

November 2025

Log 016

Shipped

Ledgerly's brand, end to end

A four-week identity for a bookkeeping tool that had outgrown its first logo by about three years. Mark, type, colour, voice, and the templates their team uses weekly.

  • New wordmark and mark, drawn from scratch
  • A colour system that survives dark mode and print
  • Nine templates covering everything they actually make

September 2025

Log 015

Studio

Adaeze joins as brand designer

We have wanted a dedicated brand practice for two years and were waiting for the right person rather than the available one. Adaeze came from an editorial studio in Lagos.

  • Brand engagements now run without a freelance bench
  • Identity work available as a standalone four-week block
  • The studio is nine people, which is where it stays

July 2025

Log 014

Shipped

Orbit Freight, six weeks flat

A quoting tool for a freight brokerage that had been running on a spreadsheet with 41 tabs. Kickoff to production in six weeks, exactly as quoted.

  • Quote turnaround down from two hours to four minutes
  • The spreadsheet is archived, not migrated — the scope said so
  • Built on infrastructure their one engineer can operate

May 2025

Log 013

Studio

We stopped writing specifications

After a year of quietly not reading our own documents, we replaced the spec with a one-page scope and a deployed URL every Friday. Projects got shorter.

  • Scope documents capped at one page, permanently
  • Friday deploys from week two of every engagement
  • Average project length down by nine days

Next

There is room in the log for what you are building.

Two engagements at a time means the calendar is real. If you want a slot this spring, the conversation should start now.

Booking new work from March 2026.